LIST OF PROJECTS

NO DESCRIPTION PRODUCT LOCATION AREA
324 Shopping Podium & Hotel , Sabah Waterfront – Kok Ann Construction Works (M) Sdn Bhd. XYPEX Admix C-1000NF
XYPEX Concentrate & XYPEX Modified
Basement Flat Slab, Frame, Upper Floor, Roofs, Lift Shaft
Internal Wet Areas, Balconies, Landscapes
12,273m3
11,000m2
325 Housing Development Phase 1B, Mahkota Cheras, Hulu Langat, Selangor XYPEX Concentrate & XYPEX Modified Bathroom Slab High Skirting
2,440m2 4,500m
326 5 Unit Bungalow, Mukim Cheras, Hulu Langat, Selangor – RDS Bina Sdn Bhd. XYPEX Concentrate & XYPEX Modified RC Flat Roof, Retaining Wall
Upturn
672m2 524m
327 Service Apartment, Lot 293, Jalan Ampang, Kuala Lumpur – Pembinaan Bintang BaruSdn Bhd. XYPEX Admix C-1000NF Retaining Wall, Basement Slab, Lift Pit Wall, Reinforced Concrete Wall 2,592m3
328 New Intermark retail podium and Integra Tower and Hotel Redevelopment on Lot 253 & 252, Jalan Tun Razak, KL – Putra Perdana Construction Sdn Bhd. XYPEX Admix C-1000NF Beam and Slab 2,320m3
329 Pusat Perubatan dan Fakulti Perubatan UCSI Universiti, Port Dickson, Negeri Sembilan – Pembinaan Ikhasas-Merak Sdn Bhd XYPEX Admix C-1000NF Ground Slab and Beds, Roof Beam, Suspended Roof Slab 4,539m3
330 Pangsapuri Servis 20 tingkat,di Seksyen 89, Jalan Ampang ,Kuala Lumpur – Pembinaan Bintang Baru XYPEX Admix C-1000NF
XYPEX Concentrate
XYPEX Concentrate & XYPEX Modified
Floor
Floor, Wall
Floor, Toilet, Rc coping, High upturn on wall, kerb, Girth, Scupper Drain
9,043m2 4,826m2 8,298m2
1,783m
331 Kedai pejabat di Pusat Bandar Baru Bangi, Kajang – Pembinaan Teguh Utama Sdn Bhd. XYPEX Admix C-1000NF
XYPEX Cocentrate & XYPED Modified
Basement
T oilet, AC Area Upstand, Drop
1,881m3
949m2 2,126m
332 Kompleks Pejabat Persiaran Setia Dagang, Setia Alam, Shah Alam. – Sustain Geotechnics Sdn. Bhd. XYPEX Admix C-1000NF
XYPEX Concentrate DS- 2
XYPEX Concentrate & XYPEX Modified
Lift Pit Base & wall, Retaining wall, Basement beam
Basement Slab
Retaining Wall
3,802m3
10,625m2
2,190m2
333 Setia City Mall, Package TP04, Superstructure – carpark. – Setia Precast Sdn Bhd. XYPEX Admix C-1000NF Roof Slab, Ramp Slab 3,857m3