Commercial Buildings

Paradigm Mall, Petaling Jaya | |
![]() |
|
Areas treated: |
Basement slab, R.C. Wall, Car Park Level 3 to 5, Lift Pit, Ramps, Driveways, Concourse Floor, Boulevard, Water Tanks, Internal Wet Areas, R.C. Flat Roof
|
Total Area: | 22,000m³ and 47,000m² |
Product Used: |
XYPEX Admix C-1000NF, XYPEX Concentrate, XYPEX Modified,XYLASTIC-500
|
Year Completed: | 2017 |

Maybank | |
![]() |
|
Project Description: | |
The Maybank project was the third largest continuous concrete pour in world history and the largest ever in South East Asia. The project used 70,000 lb of Xypex Admix C-2000 and required 60 hours to pour the foundation slab whose thickness varied from 3 ft. to 18 ft. |